Difference between revisions of "NASCase"

Jump to navigation Jump to search
Line 135: Line 135:


===Step 6. Installing the HDD / SSD Bracket and Routing Cables===
===Step 6. Installing the HDD / SSD Bracket and Routing Cables===
 
[[File:Bracket_Orientation.png|300px|thumb|left|Bracket Orientation in the NAS Case]]
[[File:NASCAsewithdrives.jpg|300px|thumb|right|Complete Assembly of the NAS Case]]
Installing the HDD/SSD bracket into the case and wiring it up is the last step before closing up the case.  
Installing the HDD/SSD bracket into the case and wiring it up is the last step before closing up the case.  


Line 145: Line 146:
For 3.5” HDDs we suggest routing power and SATA cables underneath the drives, where 2.5” HDDs/SSDs would otherwise reside.
For 3.5” HDDs we suggest routing power and SATA cables underneath the drives, where 2.5” HDDs/SSDs would otherwise reside.


For 2.5” disks you have plenty of routing options as there is much space available. The most obvious route is straight over the disks, where the 3.5” HDDs would reside.  
For 2.5” disks you have plenty of routing options as there is much space available. The most obvious route is straight over the disks, where the 3.5” HDDs would reside.


===Step 7. Closing the NAS Case and Powering On your NAS===
===Step 7. Closing the NAS Case and Powering On your NAS===